Bulkhead Installation
●
Decide on a location.
●
Allow adequate clearance behind the
unit for the cable connection to ensure the cable is not unduly stressed.
●
Ensure that there is sufficient length of cable to remove unit for servicing purposes.
●
Using the supplied template as a guide, cut out the hole for the back and drill four
4.3 mm (0.170”) holes for the studs.
●
Screw the four M4 studs into the rear of the unit.
●
Connect the cable into the rear of the unit.
●
Place the unit in position, then secure it by screwing the thumb nuts onto the studs.
Electronic Display
ED-3
User’s Guide
24
Engine Monitor
Comentários a estes Manuais