
Assembly
NOTE: The roller pin must be installed correctly to make
sure the cam follower roller and the roller pin are supplied
with oil. Inspect the new roller pin as shown to determine the
oil feed pass (1) and the alignment hole (2) locations. The oil
feed passage is drilled approximately two-thirds of the way
through the pin. The alignment hole is drilled completely
through the pin.
Use a grease pencil or a similar marker to draw a line on
the side of the roller pin that is perpendicular to the
alignment hole.
NOTE: The line will help align the roller pin correctly in the
cam follower lever.
Install the cam follower lever in an arbor press with the
leg with the alignment hole towards the top.
Install the roller into the cam follower lever.
Caution: Use the largest feeler gauge that will fit be-
tween the roller and the lever to prevent leg deflection
when installing the roller pin. This will reduce shaving of
the bronze roller pin and prevent leg breakage.
Install a feeler gauge between the roller and the leg of the
lever.
• Valve cam follower lever (A)
• Injector cam follower lever (B)
Cam Follower Assembly Cam Follower Lever - Roller Replacement (04-03)
N14 Page 4-15
Perfect..